Back to Results
First PageMeta Content
Distributed generation / Powerco / Transformer / Mains electricity / DG / Energy / Electric power / Electromagnetism


Connection of Distributed Generation above 10kW in Total Initial Application Form The name, address and telephone number of the Customer, being the owner/operator of the DG:
Add to Reading List

Document Date: 2014-03-30 23:55:32


Open Document

File Size: 44,80 KB

Share Result on Facebook

Company

Powerco Ltd / Transpower New Zealand Limited / /

/

IndustryTerm

gas etc / system operator / electricity injections / /

Organization

U.S. Securities and Exchange Commission / /

Position

Electrical Inspector / registered electrician/licensed electrical inspector / /

SocialTag