<--- Back to Details
First PageDocument Content
PCCW / Interconnection / Pacific Century Group / Economy of Hong Kong / Hong Kong Telecom
Date: 2011-12-28 10:21:44
PCCW
Interconnection
Pacific Century Group
Economy of Hong Kong
Hong Kong Telecom

CSL’s Submissions in response to the Future Arrangement of Special Condition 3.4 of the Fixed Carrier Licence Held by PCCW-HKT Telephone Limited and Hong Kong Telecommunications (HKT) Limited February 2010

Add to Reading List

Source URL: tel_archives.ofca.gov.hk

Download Document from Source Website

File Size: 26,01 KB

Share Document on Facebook

Similar Documents

Market information regarding VIP-implementation (30 MayArticle 19 Paragraph 9 of the Regulation (EUNC CAM) foresees the establishment of virtual interconnection points (VIP). The concerned German Trans

Market information regarding VIP-implementation (30 MayArticle 19 Paragraph 9 of the Regulation (EUNC CAM) foresees the establishment of virtual interconnection points (VIP). The concerned German Trans

DocID: 1vklE - View Document

Quality-of-Service: An End System Perspective  Lars Eggert MIT Communications Futures Program – Workshop on Internet Congestion Management, QoS, and Interconnection Cambridge, MA, USA

Quality-of-Service: An End System Perspective Lars Eggert MIT Communications Futures Program – Workshop on Internet Congestion Management, QoS, and Interconnection Cambridge, MA, USA

DocID: 1vjS5 - View Document

Interconnection  Control by interconnection Implementability

Interconnection Control by interconnection Implementability

DocID: 1vgG6 - View Document

Power Clip® Dual Pole Connector Series The Anderson Power Products Dual Pole Power Clip is designed as a low cost interconnection between two perpendicular

Power Clip® Dual Pole Connector Series The Anderson Power Products Dual Pole Power Clip is designed as a low cost interconnection between two perpendicular

DocID: 1vfqE - View Document

CASE STUDY  Grid Balancing with Distributed Energy Resources: Largest ISO in the U.S Picks Enbala Platform The Challenge Demand just keeps going up for PJM Interconnection, the largest

CASE STUDY Grid Balancing with Distributed Energy Resources: Largest ISO in the U.S Picks Enbala Platform The Challenge Demand just keeps going up for PJM Interconnection, the largest

DocID: 1vbgX - View Document