Back to Results
First PageMeta Content
Armour / BTR-3 / TAB / Combat


Form No. BTR-1 for fresh proposals BEAM TIME REQUEST FOR THE UTILISATION OF IUAC PELLETRON INTER-UNIVERSITY ACCELERATOR CENTRE Accelerator Based Research Centre of UGC
Add to Reading List

Document Date: 2014-04-16 02:13:39


Open Document

File Size: 146,08 KB

Share Result on Facebook

Facility

University Accelerator Centre / Designation Department University / UNIVERSITY ACCELERATOR CENTRE Accelerator Based Research Centre / /

/

IndustryTerm

ONLINE/INSITU MEASUREMENTS PLANNED WITH JUSTIFICATION FOR THE BEAM SELECTION AND NO. OF SHIFTS ASKED / travel support / /

Organization

Accelerator Users Committee / UTILISATION OF IUAC PELLETRON INTER-UNIVERSITY ACCELERATOR CENTRE Accelerator Based Research Centre of UGC INFORMATION ABOUT BTR / Designation Department University / Inter-University Accelerator Centre / /

Person

SC ST OBC / Aruna Asaf Ali Marg / /

/

Position

PRINCIPAL INVESTIGATOR / Supervisor / Category General / physicist / /

Technology

Radiation / /

SocialTag