Energy Resources Conservation Board / Government of Alberta


Microsoft Word - ERCB Investigation Report Pengrowth[removed]final.doc
Add to Reading List

Document Date: 2013-05-13 15:16:11


Open Document

File Size: 72,88 KB

Share Result on Facebook

City

Township / /

Company

Pengrowth Energy Corporation / Flint Energy Services Ltd / Gas Pipeline Systems / Skystone Engineering Inc / /

Currency

pence / /

/

Event

Product Issues / Man-Made Disaster / Force Majeure / /

Facility

Pipeline Failure / Pipeline Failure Root Cause Analysis As / Pipeline Failure Root Cause Analysis / Pipeline Specification / Pipeline Construction / /

IndustryTerm

sweet oil/water effluent / fibreglass pipe contractor / incident received media attention / transports oil well production / automated well start-up / oilfield contractor / heavy stainless steel header piping / oil/effluent / secondary contractor / town site / oil field / well start-up / pipeline failure site / release site / fibreglass manufacturer / fibreglass pipe manufacturer / cent oil / /

NaturalFeature

Swan Hills / Pengrowth Judy Creek / Judy Creek / /

Organization

Provincial Operations Centre / Swan Hills Fire Department / ERCB SAFC / Coordination and Information Centre / St. Albert Field Centre / Energy Resources Conservation Board / Canadian Council of Ministers of the Environment / Field Incident Response Support Team / Alberta Emergency Management Agency / /

/

Position

fibreglass contractor / site supervisor / foreman / secondary contractor / consultant / site supervisor and consultant / registered engineer / supervisor / contractor / oilfield contractor / a secondary contractor / fibreglass pipe contractor / welder / representative / /

Product

construction practices / inspection / installation work / measures / support / construction / /

ProvinceOrState

Texas / /

URL

www.ercb.ca / /

SocialTag