<--- Back to Details
First PageDocument Content
Construction law / Building engineering / Methodology / Performance-based building design
Date: 2009-03-30 04:08:44
Construction law
Building engineering
Methodology
Performance-based building design

Examination of Estimates of ExpenditureCONTROLLING OFFICER’S REPLY TO INITIAL WRITTEN QUESTION Reply Serial No. DEVB(PL)077

Add to Reading List

Source URL: www.bd.gov.hk

Download Document from Source Website

File Size: 65,21 KB

Share Document on Facebook

Similar Documents

The DGNB System approach to construction products  Outcome-oriented rather than input based The DGNB System takes an outcome-oriented approach to evaluating building performance. Construction products are assessed in ter

The DGNB System approach to construction products Outcome-oriented rather than input based The DGNB System takes an outcome-oriented approach to evaluating building performance. Construction products are assessed in ter

DocID: 1p6bO - View Document

Photo or figure (optional)

Photo or figure (optional)

DocID: 1lwx5 - View Document

METHODOLOGY FOR ASSESSINGPROCUREMENT SYSTEMS (MAPS) December

METHODOLOGY FOR ASSESSINGPROCUREMENT SYSTEMS (MAPS) December

DocID: 1gavc - View Document

Public Procurement Practice  PERFORMANCE MEASUREMENT STANDARD Procurement should have a performance measurement system that

Public Procurement Practice PERFORMANCE MEASUREMENT STANDARD Procurement should have a performance measurement system that

DocID: 1fzfe - View Document

Contents CONTRIBUTORS vii  FOREWORD

Contents CONTRIBUTORS vii FOREWORD

DocID: 18O5L - View Document