<--- Back to Details
First PageDocument Content
Oil wells / Petroleum production / Technology / Petroleum industry / Boreholes / Economic geology / Geotechnical engineering / Well logging / Slickline / Wireline / Camera / Angle of view
Date: 2015-10-06 07:00:21
Oil wells
Petroleum production
Technology
Petroleum industry
Boreholes
Economic geology
Geotechnical engineering
Well logging
Slickline
Wireline
Camera
Angle of view

WellCAM® Camera Platform By combining the best available Digital Imagery Components with the most Advanced Image Optimization Algorithms, Vision iO AS is proud to present the ”Next Generation” Camera Inspection Solu

Add to Reading List

Source URL: visionio.com

Download Document from Source Website

File Size: 1,03 MB

Share Document on Facebook

Similar Documents

ASSOCIATE OF APPLIED SCIENCE (AAS) PETROLEUM PRODUCTION TECHNOLOGY LAST NAME DATE  FIRST NAME

ASSOCIATE OF APPLIED SCIENCE (AAS) PETROLEUM PRODUCTION TECHNOLOGY LAST NAME DATE FIRST NAME

DocID: 1vbOj - View Document

2016 International Petroleum Environmental Conference Environmental Issues and Solutions in Exploration, Production, Refining & Distribution of Petroleum

2016 International Petroleum Environmental Conference Environmental Issues and Solutions in Exploration, Production, Refining & Distribution of Petroleum

DocID: 1tdGe - View Document

The Status of U.S. Oil and Gas Production (SpringBy Roger Blanchard I find it interesting that many of the individuals expressing the greatest concerns about oil and natural gas supplies are petroleum geologists.

The Status of U.S. Oil and Gas Production (SpringBy Roger Blanchard I find it interesting that many of the individuals expressing the greatest concerns about oil and natural gas supplies are petroleum geologists.

DocID: 1s1gQ - View Document

Oryx Petroleum Second Quarter 2016 Financial and Operational Results Average production of 3,100 bbl/d during the quarter with positive netback and reduced expenditures; First phase development of Zey Gawra has commenced

Oryx Petroleum Second Quarter 2016 Financial and Operational Results Average production of 3,100 bbl/d during the quarter with positive netback and reduced expenditures; First phase development of Zey Gawra has commenced

DocID: 1rWbc - View Document

BP Statistical Review of World EnergyAugust 2014

BP Statistical Review of World EnergyAugust 2014

DocID: 1ru6D - View Document