Back to Results
First PageMeta Content
Petroleum engineering / Petroleum production / Pipelines / Pigging / Pipe / Flow line / Technology / Soft matter / Piping / Petroleum / Oilfield terminology


Petroleum Branch APPLICATION FOR A FLOW LINE LICENCE In accordance with Subsection 146(1,a) of The Oil and Gas Act, no one shall construct a flow line without the written approval of an inspector. This application must b
Add to Reading List

Document Date: 2009-12-04 12:09:48


Open Document

File Size: 147,00 KB

Share Result on Facebook

IndustryTerm

telephone# / steel pipe / /

Organization

District Office / /

/

Position

Construction Contractor / inspector / /

ProgrammingLanguage

FL / L / /

SocialTag