Back to Results
First PageMeta Content
Hydrology / Flood control / Fluvial landforms / Riparian / Macro-engineering / Red River Floodway / Red River Flood / Portage Diversion / Flood / Water / Provinces and territories of Canada / Manitoba


Microsoft Word - Natural WL Executive Summary Final.doc
Add to Reading List

Document Date: 2004-06-10 11:47:21


Open Document

File Size: 398,62 KB

Share Result on Facebook

City

St. Norbert / Winnipeg / /

Company

Acres Manitoba Limited / /

Currency

pence / /

Event

Natural Disaster / /

Facility

Provencher Bridge / Norwood Bridge / Highway Bridge / Keewatin Subdivision Bridge / Norwood Bridge James Ave CNR Bridge CPR Bridge Louise Bridge Redwood Bridge / Redditt Subdivision Bridge / Lyndale Dyke / Bergen Cutoff Bridge / South Perimeter Highway / Redwood Bridge / North City Limits Redwood Bridge Bergen Cutoff Bridge / Elm Park Bridge / ft. Pumping Station / Louise Bridge / /

IndustryTerm

sewer systems / /

NaturalFeature

Bunns Creek / Floodway Inlet / NEAR NETLEY CREEK / River Floodway channel / Floodway Channel Inlet / Seine River / Assiniboine river / /

Organization

Manitoba Government / federal government / US Army Corps of Engineers River Analysis System / Floodway Operation Review Committee / Royal Commission on Flood Cost-Benefit / Steering Committee / Manitoba Water Commission / Middle Church / Royal Commission / /

Person

James Ave Datum / /

Position

Contractor / Minister / Floodway Inlet EXECUTIVE / Executive / /

Technology

GIS / /

SocialTag