Pressurizer

Results: 74



#Item
41European Clearinghouse: Report on Leaks and Cracks of the Reactor Coolant Pressure Boundary Summary Report of an European Clearinghouse Topical Study

European Clearinghouse: Report on Leaks and Cracks of the Reactor Coolant Pressure Boundary Summary Report of an European Clearinghouse Topical Study

Add to Reading List

Source URL: publications.jrc.ec.europa.eu

Language: English - Date: 2014-12-19 20:18:40
42Microsoft Word - McGough Testimony FINAL DRAFT.docx

Microsoft Word - McGough Testimony FINAL DRAFT.docx

Add to Reading List

Source URL: democrats.science.house.gov

Language: English - Date: 2014-12-11 09:52:09
43I N N O VAT I N G  NUCLEAR TECHNOLOGY

I N N O VAT I N G NUCLEAR TECHNOLOGY

Add to Reading List

Source URL: www.ams-corp.com

Language: English - Date: 2014-02-20 09:57:31
44Microsoft Word - McGough Testimony FINAL DRAFT.docx

Microsoft Word - McGough Testimony FINAL DRAFT.docx

Add to Reading List

Source URL: science.house.gov

Language: English - Date: 2014-12-11 10:45:07
45/  HISTORIC AMERICAN ENGINEERING RFCORr INDEX TO PHOTOGRAPHS Shipping Port Atomic Power Station Shippingport

/ HISTORIC AMERICAN ENGINEERING RFCORr INDEX TO PHOTOGRAPHS Shipping Port Atomic Power Station Shippingport

Add to Reading List

Source URL: lcweb2.loc.gov

Language: English - Date: 2011-08-29 11:50:38
46Nuclear Regulation NEA/CSNI/R[removed]April 2013 www.oecd-nea.org  Final Integration Report

Nuclear Regulation NEA/CSNI/R[removed]April 2013 www.oecd-nea.org Final Integration Report

Add to Reading List

Source URL: www.oecd-nea.org

Language: English - Date: 2013-05-03 11:05:34
47S-99 Reports for 2013 In accordance with regulatory document entitled S-99 Reporting Requirements for Operating Nuclear Power Plants, power reactors operating in Canada must issue formal reports to the Canadian Nuclear S

S-99 Reports for 2013 In accordance with regulatory document entitled S-99 Reporting Requirements for Operating Nuclear Power Plants, power reactors operating in Canada must issue formal reports to the Canadian Nuclear S

Add to Reading List

Source URL: www.nbpower.com

Language: English - Date: 2014-04-01 15:17:57
48Microsoft PowerPoint - SIAM_xLPR_Portfolio2011.pptx

Microsoft PowerPoint - SIAM_xLPR_Portfolio2011.pptx

Add to Reading List

Source URL: computing.ornl.gov

Language: English - Date: 2011-06-10 10:54:38
49Nuclear Intestines: “The Tube Bundle” Inside each of the old steam generators from Bruce reactors are 4200 radioactively contaminated tubes, similar to those shown here. A nuclear steam generator is an enormous vesse

Nuclear Intestines: “The Tube Bundle” Inside each of the old steam generators from Bruce reactors are 4200 radioactively contaminated tubes, similar to those shown here. A nuclear steam generator is an enormous vesse

Add to Reading List

Source URL: www.ccnr.org

Language: English - Date: 2011-03-07 18:10:38
502. What went wrong? The accident began at 4:00 a.m. on March 28, 1979. For an unknown reason, the feed pump (in the turbine water loop; see the schematic below) stopped operating. Without this pump, the turbine water cou

2. What went wrong? The accident began at 4:00 a.m. on March 28, 1979. For an unknown reason, the feed pump (in the turbine water loop; see the schematic below) stopped operating. Without this pump, the turbine water cou

Add to Reading List

Source URL: www.threemileisland.org

Language: English - Date: 2007-11-26 10:45:27