Back to Results
First PageMeta Content
Technology / Oilfield terminology / Petroleum engineering / Well logging / Casing / Drilling fluid / Wellhead / Coiled tubing / Cement bond log / Oil wells / Petroleum / Petroleum production


General Plugging & Abandonment Procedure_Rev1
Add to Reading List

Document Date: 2012-04-09 11:14:07


Open Document

File Size: 46,81 KB

Share Result on Facebook

Currency

USD / /

Facility

Remove wellhead / /

IndustryTerm

cement retainer / blowout prevention equipment / wellhead equipment / metal cap / cement / cement bond log / steel plate / cement plug / cement level / fresh water cement plug / crane equipment / /

MarketIndex

Set 200 / SET 100 / /

Organization

Approval / Approval of Plan Before / U.S. Environmental Protection Agency / /

Position

licensed professional land surveyor / professional engineer / General / director of the California Underground Injection Control / /

Product

Q-2 ABANDONMENT COST ESTIMATE PER INJECTION / California Underground Injection / /

SocialTag