Back to Results
First PageMeta Content
Silver Line / Airport / Washington Metropolitan Area Transit Authority / Design–build / METRORail / Metropolitan Transit Authority of Harris County / Washington Metro / Transportation in the United States / Building engineering / Construction


Airports Authority Board Selects Design-Build Delivery System for Phase 2 of Dulles Corridor Metrorail Project On May 2, 2009, the Metropolitan Washington Airports Authority (Airports Authority) Board of Directors
Add to Reading List

Document Date: 2012-09-28 10:26:16


Open Document

File Size: 198,47 KB

Share Result on Facebook

IndustryTerm

rail transportation / project delivery systems / /

Organization

Virginia Department of Rail and Public Transit / Washington Metropolitan Area Transit Authority / Virginia Department of Transportation / Metropolitan Washington Airports Authority / /

Position

design-build contractor / /

ProvinceOrState

Loudoun County / Fairfax County / /

SocialTag