Back to Results
First PageMeta Content
Construction / New-construction building commissioning / Building enclosure commissioning / Project commissioning / Building engineering / Architecture / Technology


Document Date: 2014-07-25 11:14:40


Open Document

File Size: 538,04 KB

Share Result on Facebook

City

Athens / /

Company

Environmental Effects Research Laboratory / Environmental Balancing Bureau PECI Portland Energy Conservation Inc. / /

Facility

Building Automation System / Building Systems / Factory Acceptance Testing / Contract Negotiation Phase Construction Phase Field Verification EPA Environmental Effects Research Laboratory / Building Rating / /

IndustryTerm

energy conservation / maximum energy efficiency / energy efficiency measure / equipment/systems / improved energy efficiency / energy-efficient improvement / start equipment / individual systems / regular communications / energy management system / electronic data-gathering device / start-up / mechanical systems / certain systems / waste energy / energy / /

Organization

Services Division Office / U. S. Department of Energy / A/E and Commissioning Authority / RCx Retro-Commissioning / EPA Ecosystems Research Division / Architect Engineer ASHRAE American Society of Heating / Testing / Adjusting / and Balancing USDOE U. S. Department / Commissioning Authority / Environmental Protection Agency / /

Person

Commissioning Commissioning / Commissioning Roles / /

Position

team member / contractor / Prime Minister / manager / contractors / Architect / design consultant / manager / designer / project manager / Association CM Construction Manager / registered professional engineer / Manager CSI Construction Specifications / representative / manager / design team / project manager / design team / Forward / General / Construction Manager / Data logger / /

SocialTag