<--- Back to Details
First PageDocument Content
Submittals / Architect / HVAC / Piping / Project management / Building / Brief / New-construction building commissioning / Design assist / Building engineering / Architecture / Construction
Date: 2014-09-26 08:51:20
Submittals
Architect
HVAC
Piping
Project management
Building
Brief
New-construction building commissioning
Design assist
Building engineering
Architecture
Construction

PART ONE - THE DESIGN PROCESS

Add to Reading List

Source URL: fod.osu.edu

Download Document from Source Website

File Size: 135,74 KB

Share Document on Facebook

Similar Documents

Project Administrative Procedures 1) Submittals and Shop Drawings: Please prepare your submittals, shop drawings and samples in the following form: a) Catalog Cuts and Manufacturers Data: Submit six copies of catalog cut

DocID: 1vjNp - View Document

California Office of Historic Preservation Detailed Recommendations for Section 106 Consultation Submittals This document provides guidance for federal agencies consulting with the State Historic Preservation Officer (SH

DocID: 1uRF1 - View Document

Enclosure 2 Data Submittal Requirements for data that cannot be submitted via CEDEN: 1. All submittals shall be in electronic format that is PC compatible, preferably in Microsoft OfficeReferences to Web site

DocID: 1tmmy - View Document

FPB POLICY: PLAN SUBMITTALS FOR LESS THAN 21 SPRINKLERS Created: July 17, 2009 Revised: January 24, 2014 Effective Date: Immediately From the Office of the Fire Prevention Bureau – PhoneThis pol

DocID: 1tmll - View Document

FY 2017 TRANSPORTATION ALTERNATIVES PROGRAM (TAP) PROJECT SUBMITTAL FORM Submittals are due by 4:00 p.m. on January 23, 2017 at the Office of the Laredo City Secretary 1110 Houston Street, 3rd floor A total of $717,903 i

DocID: 1tk12 - View Document