RAMP

Results: 2011



#Item
12017 American Control Conference Sheraton Seattle Hotel May 24–26, 2017, Seattle, USA Stochastic Predictive Freeway Ramp Metering from Signal Temporal Logic Specifications

2017 American Control Conference Sheraton Seattle Hotel May 24–26, 2017, Seattle, USA Stochastic Predictive Freeway Ramp Metering from Signal Temporal Logic Specifications

Add to Reading List

Source URL: dorsa.fyi

Language: English - Date: 2018-08-10 01:41:28
    2I-80 ICM Project Interstate 80 Integrated Corridor Mobility (ICM) Project This project will implement ramp metering and incident management along the I-80 from the San FranciscoOakland Bay Bridge Toll Plaza in Alameda Co

    I-80 ICM Project Interstate 80 Integrated Corridor Mobility (ICM) Project This project will implement ramp metering and incident management along the I-80 from the San FranciscoOakland Bay Bridge Toll Plaza in Alameda Co

    Add to Reading List

    Source URL: forum8.com

    - Date: 2014-02-12 05:22:54
      3The ramp from inbound IKennedy Expressway) to inbound Congress Parkway will be fully closed for approximately two years beginning January 15, 2018. Reason for Detour: The south to east (SE) ramp will be closed fo

      The ramp from inbound IKennedy Expressway) to inbound Congress Parkway will be fully closed for approximately two years beginning January 15, 2018. Reason for Detour: The south to east (SE) ramp will be closed fo

      Add to Reading List

      Source URL: www.circleinterchange.org

      - Date: 2018-02-06 14:35:36
        4STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION ON THE PROPOSALS RECEIVED ON, THE FOLLOWING AWARDS HAVE BEEN MADE BY THE SOUTH DAKOTA TRANSPORTATION COMMISION AND REQUIRED ENTITIES: --- ADA Curb Ramp Upgrad

        STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION ON THE PROPOSALS RECEIVED ON, THE FOLLOWING AWARDS HAVE BEEN MADE BY THE SOUTH DAKOTA TRANSPORTATION COMMISION AND REQUIRED ENTITIES: --- ADA Curb Ramp Upgrad

        Add to Reading List

        Source URL: www.sddot.com

        Language: English - Date: 2018-03-09 15:15:23
          5Ultra Linear Ramps Any Ramp Time Any Voltage (mV to kV) High Voltage Pulse Generator Model 731 dde

          Ultra Linear Ramps Any Ramp Time Any Voltage (mV to kV) High Voltage Pulse Generator Model 731 dde

          Add to Reading List

          Source URL: barthelectronics.com

          Language: English - Date: 2017-06-01 20:53:46
            6City of Coffman Cove Regular City Council Meeting Minutes (#16 on recorder) Thursday March 17th, 2016 at City Hall 7:00PM 6:45 Public Hearing: CDBG Drive Down Ramp: Open for Public comment and questions: Project Manager,

            City of Coffman Cove Regular City Council Meeting Minutes (#16 on recorder) Thursday March 17th, 2016 at City Hall 7:00PM 6:45 Public Hearing: CDBG Drive Down Ramp: Open for Public comment and questions: Project Manager,

            Add to Reading List

            Source URL: ccalaska.com

            Language: English - Date: 2016-08-25 13:08:20
              7WOOD-PAWCATUCK WATERSHED ASSOCIATION POTTER HILL MILL TO WESTERLY MUNICIPAL BOAT RAMP P

              WOOD-PAWCATUCK WATERSHED ASSOCIATION POTTER HILL MILL TO WESTERLY MUNICIPAL BOAT RAMP P

              Add to Reading List

              Source URL: www.wpwa.org

              Language: English - Date: 2016-06-24 11:26:12
                8Norman Rockwell Museum Driving Directions:  from east Boston (two-and-a-half hours) or Springfield (one hour): Take the Massachusetts Turnpike (I-90) West, getting off at exit 2 - Lee. At the light at the end of the ramp

                Norman Rockwell Museum Driving Directions: from east Boston (two-and-a-half hours) or Springfield (one hour): Take the Massachusetts Turnpike (I-90) West, getting off at exit 2 - Lee. At the light at the end of the ramp

                Add to Reading List

                Source URL: www.nrm.org

                Language: English
                  9UNIVERSITY AVE. PARKING RAMP TO LOADING DOCK

                  UNIVERSITY AVE. PARKING RAMP TO LOADING DOCK

                  Add to Reading List

                  Source URL: mac-events.org

                  - Date: 2017-09-26 11:31:03
                    10Adapting Voltage Ramp-up Time for Temperature Noise Reduction on Memory-based PUFs Abstract—The efficiency and cost of silicon PUF-based applications, and in particular key generators, are heavily impacted by the level

                    Adapting Voltage Ramp-up Time for Temperature Noise Reduction on Memory-based PUFs Abstract—The efficiency and cost of silicon PUF-based applications, and in particular key generators, are heavily impacted by the level

                    Add to Reading List

                    Source URL: boriskennes.wpengine.com

                    Language: English - Date: 2017-05-19 10:34:01