Back to Results
First PageMeta Content
Soil contamination / Organochlorides / Chicago metropolitan area / Waukegan /  Illinois / Polychlorinated biphenyl / Outboard Marine Corporation / Environmental remediation / Superfund / Trichloroethylene / Environment / Pollution / Chemistry


EPA Proposed Cleanup Plan for OMC Plant 2 to September[removed]Record of Decision
Add to Reading List

Document Date: 2012-07-11 08:01:19


Open Document

File Size: 682,16 KB

Share Result on Facebook

City

Waukegan / Chicago / /

Company

Outboard Marine Corporation / OMC Plant 2 Site Outboard Marine Corporation / /

Event

Product Issues / Environmental Issue / Bankruptcy / /

Facility

C. Site Characteristics OMC Plant / Waukegan Public Library / ODC building / Waukegan Harbor / Coke Plant / OMC Plant / B. Site Background The OMC Plant / Jane Adams Center / /

IndustryTerm

natural gas line / high-pressure gas main / transformer oil / production line machinery beginning / direct-push technology / breakdown products / physical and chemical properties / metal-working areas / high-pressure natural gas pipeline / manufacturing processes / utilities areas / /

NaturalFeature

Lake Michigan / /

Organization

United States Environmental Protection Agency / Operable Unit / Jane Adams Center / IEPA / U.S ENVIRONMENTAL PROTECTION AGENCY / US Federal Reserve / DNAPL EPA / /

Product

soil surrounding / building / soil / ceiling / capping / concrete slab / groundwater / concrete / areas Excavation / walls / /

ProvinceOrState

North Shore Sanitary District / Rhode Island / Illinois / Michigan / /

Technology

bioremediation / direct-push technology / /

SocialTag