Back to Results
First PageMeta Content
Academia / Reliability centered maintenance / Preventive maintenance / Tennessee Valley Authority / Reliability engineering / Predictive maintenance / Availability / PM / Maintenance /  repair /  and operations / Maintenance / Knowledge / Science


TVA RESTRICTED INFORMATION Memorandum from the Office of the Inspector General September 29, 2014 James R. Dalrymple, LP 3K-C
Add to Reading List

Document Date: 2014-10-09 16:52:16


Open Document

File Size: 972,67 KB

Share Result on Facebook

City

Kingston / /

Company

TVA Coal / James R. Dalrymple LP / /

Facility

Plant Allen Bull Run Cumberland Gallatin Kingston Paradise Shawnee Average Percentage / plant PM / Electric Power Research Institute / Plant Reliability Optimization.3 The MBO / /

IndustryTerm

summary word search / word search function / station system equipment / plant equipment / /

Organization

TVA RESTRICTED INFORMATION office of the Inspector General Evaluation Report ABBREVIATIONS EPRI Electric Power Research Institute MBO Maintenance Basis Optimization PaSTA Planning / Electric Power Research Institute / 7B-K TVA Board of Directors OIG File / TVA RESTRICTED INFORMATION office of the Inspector General Evaluation Report To / TVA RESTRICTED INFORMATION TVA RESTRICTED INFORMATION office of the Inspector General Evaluation Report To / TVA RESTRICTED INFORMATION office of the Inspector General Evaluation Report Also / TVA RESTRICTED INFORMATION office of the Inspector General Evaluation Report / TVA RESTRICTED INFORMATION office of the Inspector General Evaluation Report BACKGROUND According to / Council of the Inspectors General for Integrity and Efficiency / office of the Inspector General / Tennessee Valley Authority / TVA RESTRICTED INFORMATION office of the Inspector General Evaluation Report TABLE OF CONTENTS EXECUTIVE SUMMARY / /

Person

Dwain K. Lanier / Justin C. Maierhofer / Richard W. Moore / Gregory R. Stinson / Robert E. Martin / Lucas W. Cotter / Charles G. Pardee / William D. Johnson / Janell B. Cunio Lucas / Janell B. Cunio / /

/

Position

coal plant PM / canceled PM / risk-based PM / nuclear PM / UNCOMPLETED AND UNESTABLISHED PM / OFFICIAL / appropriate PM / Sustainable optimized PM / Prime Minister / optimized PM / Senior Auditor / advanced PM / Senior Vice President / Power Operations / Scheduling Tool Assistant / monthly PM / AND METHODOLOGY PM / Auditor / PLANT AND PM METRICS CAPTURED MAY NOT FULLY REPRESENT ALL PM / Director / Evaluations / average PM / Plant Preventive Maintenance EXECUTIVE / Senior Vice President / Power Operations COAL PLANT PREVENTIVE MAINTENANCE Audit Team / Assistant Inspector General / Inspector General / Non-Critical PM / /

SocialTag