Back to Results
First PageMeta Content
Architecture / New-construction building commissioning / Air handler / HVAC / Indoor air quality / Duct / Damper / Ventilation / Heating /  ventilating /  and air conditioning / Technology / Engineering


BELLINGHAM TECHNICAL COLLEGE — RETRO-COMMISSIONING IDENTIFIES INDOOR AIR QUALITY SOLUTIONS Since first being occupied in 1994, the College Services Building at Bellingham Technical College had been plagued with indoor
Add to Reading List

Document Date: 2008-04-16 20:19:52


Open Document

File Size: 169,26 KB

Share Result on Facebook

Company

Keithly Welsh Associates / Bryan Welsh Henry Kline Partnership / RETRO-COMMISSIONING IDENTIFIES INDOOR AIR QUALITY SOLUTIONS / The Henry Klein Partnership / /

Currency

USD / /

/

Event

FDA Phase / Force Majeure / /

Facility

College Services Building In / BELLINGHAM TECHNICAL COLLEGE / General Administration Bldg. / COMMISSIONING QUICK FACTS Building Name College Services Building / Administrative Services Bellingham Technical College / College Services Building / Square Foot / Administration building / Technical Writing/Editing Washington State / /

IndustryTerm

annual energy savings / potential solutions / energy consumption / repaired and new systems / increased energy consumption / /

NaturalFeature

University Extension Energy Program Fall / /

Organization

General Administration Division of Engineering & Architectural Services / General Administration / Washington State Department / BELLINGHAM TECHNICAL COLLEGE / Washington State University / TECHNICAL COLLEGE / /

Person

Melchor Berona / Kathryn Longfellow / Julie Blazek Berona / Roger Wigfield / Julie Blazek / /

/

Position

Design Engineer / contractor / architect / Vice President / mechanical engineer / /

Product

commissioning / Commissioning Agent / /

URL

http /

SocialTag