S phase index

Results: 18



#Item
1PHYSICAL REVIEW B 86, Active negative-index metamaterial powered by an electron beam M. A. Shapiro,1 S. Trendafilov,2 Y. Urzhumov,3 A. Al`u,4 R. J. Temkin,1 and G. Shvets2,* 1

PHYSICAL REVIEW B 86, Active negative-index metamaterial powered by an electron beam M. A. Shapiro,1 S. Trendafilov,2 Y. Urzhumov,3 A. Al`u,4 R. J. Temkin,1 and G. Shvets2,* 1

Add to Reading List

Source URL: www.psfc.mit.edu

Language: English - Date: 2013-01-30 11:32:19
2Japan’s Economy after Exit from Deflation After the Bank of Japan embarked on a new phase of monetary easing last April, the consumer price index stabilized at above year-earlier levels, silencing claims that the Japan

Japan’s Economy after Exit from Deflation After the Bank of Japan embarked on a new phase of monetary easing last April, the consumer price index stabilized at above year-earlier levels, silencing claims that the Japan

Add to Reading List

Source URL: www.japanpolicyforum.jp

Language: English - Date: 2015-01-14 13:40:29
3Phase Matching (PM) and Full Spectrum Inversion (FSI) Comparison of Airborne and Spaceborne GPS Radio Occultation Signals Kuo-Nung Wang1 , James L. Garrison1, Brian Murphy2, Jennifer S. Haase3, Chi O. Ao4 1. School of Ae

Phase Matching (PM) and Full Spectrum Inversion (FSI) Comparison of Airborne and Spaceborne GPS Radio Occultation Signals Kuo-Nung Wang1 , James L. Garrison1, Brian Murphy2, Jennifer S. Haase3, Chi O. Ao4 1. School of Ae

Add to Reading List

Source URL: www.cosmic.ucar.edu

Language: English - Date: 2014-10-15 14:00:24
4Top Tourist Destination Overview The previous phase of the park’s  capital of Asia. In 2012, the fourth

Top Tourist Destination Overview The previous phase of the park’s capital of Asia. In 2012, the fourth

Add to Reading List

Source URL: www.hketoberlin.gov.hk

Language: English - Date: 2013-09-06 05:39:03
5News Release FOR IMMEDIATE RELEASE Fortis Generation starts next phase of project feasibility studies for Similkameen River water storage and hydroelectric generation facility Proposed project will create jobs and bring

News Release FOR IMMEDIATE RELEASE Fortis Generation starts next phase of project feasibility studies for Similkameen River water storage and hydroelectric generation facility Proposed project will create jobs and bring

Add to Reading List

Source URL: www.csria.org

Language: English - Date: 2013-10-08 18:48:35
6THE EUROSDR PROJECT “RADIOMETRIC ASPECTS OF DIGITAL PHOTOGRAMMETRIC IMAGES” – RESULTS OF THE EMPIRICAL PHASE E. Honkavaara a, *, R. Arbiol b, L. Markelin a, L. Martinez b, S. Bovet c, M. Bredif d, L. Chandelier e,

THE EUROSDR PROJECT “RADIOMETRIC ASPECTS OF DIGITAL PHOTOGRAMMETRIC IMAGES” – RESULTS OF THE EMPIRICAL PHASE E. Honkavaara a, *, R. Arbiol b, L. Markelin a, L. Martinez b, S. Bovet c, M. Bredif d, L. Chandelier e,

Add to Reading List

Source URL: www.ipi.uni-hannover.de

Language: English - Date: 2012-01-18 03:35:44
7NioGold	
  Is	
  Starting	
  Phase	
  2	
  of	
  Its	
  Project	
  on	
  the	
  Heels	
  of	
  Good	
  Drill	
  Results	
   Feb	
  1,	
  2012	
   By	
  	
  Dr.	
  Allen	
  Alper	
  and	
  Aaron

NioGold  Is  Starting  Phase  2  of  Its  Project  on  the  Heels  of  Good  Drill  Results   Feb  1,  2012   By    Dr.  Allen  Alper  and  Aaron

Add to Reading List

Source URL: www.niogold.com

Language: English - Date: 2014-05-23 16:54:36
8S&P/TSX Composite Index / Road / Canada / Economy of Canada / Enbridge / S&P/TSX 60 Index

Line 6B 2012 Maintenance and Rehabilitation & Line 6B Phase 2 Replacement Projects IDEM Water Quality Certification Independent Environmental Monitor Weekly Observation Report Observation Dates: 8[removed]thru[removed]

Add to Reading List

Source URL: www.in.gov

Language: English - Date: 2014-08-20 11:25:17
9Line 6B 2012 Maintenance and Rehabilitation & Line 6B Phase 2 Replacement Projects IDEM Water Quality Certification Independent Environmental Monitor Weekly Observation Report Observation Dates: [removed]thru[removed]IEM

Line 6B 2012 Maintenance and Rehabilitation & Line 6B Phase 2 Replacement Projects IDEM Water Quality Certification Independent Environmental Monitor Weekly Observation Report Observation Dates: [removed]thru[removed]IEM

Add to Reading List

Source URL: www.in.gov

Language: English - Date: 2014-08-20 11:25:17
10Request for formal written reply phase in final arbitration process

Request for formal written reply phase in final arbitration process

Add to Reading List

Source URL: www.crtc.gc.ca

Language: English - Date: 2012-06-05 11:27:55