Back to Results
First PageMeta Content
Electric power distribution / Samangan Province / Distribution transformer / Samangan / Railway electrification system / Circuit breaker / Electric power system / Switchgear / Utility pole / Electric power / Electromagnetism / Electrical engineering


AYBAK CITY (SAMANGAN PROVINCE) DISTRIBUTION SYSTEM CLOSE-OUT REPORT Prepared by: Raul Zuniga/Clayton Strampher/Jack Whippen/Tufail Memon
Add to Reading List

Document Date: 2008-09-11 13:58:46


Open Document

File Size: 772,90 KB

Share Result on Facebook

City

Samangan City / AYBAK CITY / Washington / DC / Aybak / Kabul / /

Company

Advanced Engineering Associates International Inc. / DABM / Afghan Electric Power Corporation / Commissioners / Fluor / DABM’s Aybak / /

Country

Turkmenistan / Tajikistan / Turkey / Uzbekistan / Afghanistan / India / /

Currency

USD / /

Event

Person Communication and Meetings / Force Majeure / Business Partnership / /

Facility

North East Power System / Afghanistan Energy Information Center / /

/

IndustryTerm

energy corridor / basic accounting / public relations problems / revenue requirements to properly tool / steel cross arms / construction management / system maintenance tools / electric energy / fuse box services / protection devices / “seed” systems / electric services / stable energy corridor / /

NaturalFeature

Aybak River / /

Organization

Board of Commissioners / Asian Development Bank / Afghanistan Energy Information Center / Ministry of Energy and Water / United States Agency for International Development / World Bank / US Federal Reserve / Central Statistics Office / Government of India / Rural Electric Association / /

Person

Raul Zuniga / Clayton Strampher / Jack Whippen / Shakoor / /

/

Position

approved sub-contractor / local Governor / manager / WB / Governor / official national standard / /

ProgrammingLanguage

DC / /

ProvinceOrState

SAMANGAN PROVINCE / /

Region

Central Asian Republics / /

URL

www.aeaiinc.com / /

SocialTag