Back to Results
First PageMeta Content
Reinforced concrete / Sarah Mildred Long Bridge / Civil engineering / New Hampshire / Structural engineering / Bridges / Concrete


New Hampshire Department of Transportation ‘ Appendix A Inspection Forms
Add to Reading List

Document Date: 2013-03-10 05:00:00


Open Document

File Size: 84,26 KB

Share Result on Facebook

City

Portsmouth / /

Country

United States / /

Facility

CRIBBING UNDER NORTH TOWER / Bridge Notes / Bridge Type / SECTION LOSS AT RR SPAN SOUTH TOWER / BRIDGE IS IN UP POSITION DUE TOO FAILED UNDERWATER POWER CABLE / NEW ELECTRIC UNIT AT NORTH EAST LIFT PIER / Highway System / Bridge Dimensions / NEW MOTORS BOTH TOWERS / State Definition Bridge / Bridge Scour Critical Status / Correctable Minor Damage Above Desirable Criteria Stable / Definition Bridge Urban Expressway Turnpike / Sarah Mildred Long Bridge / MINOR SCOUR AT THE NOSE OF EACH PIER / Abutment NHDOT / STEEL HOLED AT PIER / END UNDER BRIDGE / WEST GIRDER HOLED AT PIER / BRIDGE HAS HEAVY SECTION LOSS AND HOLED AREAS / Bridge Approach Rail / Bridge Skew / RR Sarah M. Long Bridge Bridge / BUILDING VIBRATING / Bridge Design Bridge Inspection Report Portsmouth / /

NaturalFeature

PISCATAQUA RIVER / /

Organization

of Transportation Existing Bridge Section Bureau of Bridge Design Bridge Inspection Report Portsmouth / Roadway Width Bridge Service / Inspection Forms Sarah Mildred Long Bridge In-depth Inspection and Condition Report New Hampshire Department of Transportation Existing Bridge Section Bureau of Bridge Design Bridge Inspection Report Portsmouth / New Hampshire Department of Transportation / Spans Main Unit / New Hampshire Department of Transportation Existing Bridge Section Bureau of Bridge Design Bridge Inspection Report / Service on Bridge / US Federal Reserve / /

Position

Inspector / /

SocialTag