<--- Back to Details
First PageDocument Content
National Security Cutter / Rescue / Military organization / Sentinel class cutter / Bollinger Shipyards / Medium endurance cutter / Offshore Patrol Cutter / United States Coast Guard / Watercraft / Integrated Deepwater System Program
Date: 2015-02-23 08:43:16
National Security Cutter
Rescue
Military organization
Sentinel class cutter
Bollinger Shipyards
Medium endurance cutter
Offshore Patrol Cutter
United States Coast Guard
Watercraft
Integrated Deepwater System Program

Coast Guard Cutter Procurement:

Add to Reading List

Source URL: www.uscg.mil

Download Document from Source Website

File Size: 2,16 MB

Share Document on Facebook

Similar Documents

The Christening of JAMES By LTJG William Pié, Assistant Engineer Officer, USCGC JAMES (WMSL 754) On August 16th, 2014, the Coast Guard’s fifth National Security Cutter was christened Coast Guard Cutter JAMES at Ingall

DocID: 1kFf7 - View Document

The Christening of JAMES By LTJG William Pié, Assistant Engineer Officer, USCGC JAMES (WMSL 754) On August 16th, 2014, the Coast Guard’s fifth National Security Cutter was christened Coast Guard Cutter JAMES at Ingall

DocID: 1krss - View Document

Rescue / High endurance cutter / Coast guard / Military / United States Coast Guard / National Security Cutter / Military organization

Offshore Patrol Cutter (OPC) Brief to ASNE Offshore Patrol Cutter (OPC) Project CG-9322 | CAPT Brad Fabling | FEB2010

DocID: 1gvAo - View Document

Gendarmerie / Icebreaker / USCGC Healy / National Security Cutter / Equipment of the United States Coast Guard / Polar class icebreaker / Watercraft / United States Coast Guard / Coast guards

ISSUE BRIEF No. 3889 | April 2, 2013 Strengthen the Coast Guard’s Presence in the Arctic

DocID: 1aMJT - View Document

Aircraft / National Security Cutter / Coast guard / Sentinel class cutter / Lockheed C-130 Hercules / Integrated Deepwater System Program / United States Coast Guard / Aviation / Alenia C-27J Spartan

GAO-15-620T, Coast Guard Acquisitions: As Major Assets Are Fielded, Overall Portfolio Remains Unaffordable

DocID: 19Ti6 - View Document