Back to Results
First PageMeta Content
Ice dam / Peace River


2013 – 2014 Peace River Report No. 42 Ground observations yesterday tracked the Peace River ice front along the Shaftesbury Trail until it passed through the Town of Peace River (km 396 at the Hwy 2 bridge) at 11:45 MS
Add to Reading List

Document Date: 2014-04-23 18:00:08


Open Document

File Size: 273,78 KB

Share Result on Facebook

Facility

Shaftesbury Trail / Fort St. John / DMI bridge / /

NaturalFeature

Peace River / Open channel / BC Hydro Peace River / Smoky River / /

Organization

River Ice Observation Report River Forecast Centre / /

SocialTag