Back to Results
First PageMeta Content
Incineration / Thermal treatment / Environmental engineering / Fukushima Daiichi Nuclear Power Plant / Environment / Sheffield Incinerator / Incinerators / Waste management / Chemical engineering


Mistaken Transport of Accumulated Water to the Incineration Workshop Building at <Reference> the Central Radioactive Waste Treatment Facility of the Fukushima Daiichi Nuclear April 14, 2014 TEPCO Power Station Centra
Add to Reading List

Document Date: 2014-04-14 06:15:02


Open Document

File Size: 114,58 KB

Share Result on Facebook

Company

TEPCO / /

Facility

Central Radioactive Waste Treatment Facility / On-site Bunker Bldg. / Processing Main Bldg. / P High Temperature Incinerator Bldg. / P Incinerator Work Bldg. / Incineration Workshop Building / Processing building / Sub Bldg. / Nuclear reactor / /

IndustryTerm

accumulated water transportation / water transportation pump / /

Product

Water injection / /

Technology

Incineration / /

SocialTag