Back to Results
First PageMeta Content
Civil engineering / Mechanics / Soil / Slope stability / Shear strength / Dam / Soil mechanics / Geology / Geotechnical engineering


Duncan AL In October 1961, the construction of Waco Dam was interrupted by the occurrence of a slide along a 1500-ft section of the embankment resting on the Pepper shale formation,
Add to Reading List

Document Date: 2014-09-08 07:16:04


Open Document

File Size: 769,77 KB

Share Result on Facebook

City

San Francisco / /

Country

United States / /

Event

Natural Disaster / /

Facility

Waco Dam / Port of San Francisco / Waco Dam embankment / Debris dike Surface / /

NaturalFeature

San Francisco Bay / /

Organization

Corps of Engineers / Pepper / TE CHAPTER / United States Army / U.S. government / /

SocialTag