<--- Back to Details
First PageDocument Content
Massachusetts Institute of Technology / SPHERES / Satellites / STS-121 / Marshall Space Flight Center / STS-116 / International Space Station / Flight test / Space Shuttle Columbia disaster / Spaceflight / Space technology / Manned spacecraft
Date: 2011-08-03 10:57:59
Massachusetts Institute of Technology
SPHERES
Satellites
STS-121
Marshall Space Flight Center
STS-116
International Space Station
Flight test
Space Shuttle Columbia disaster
Spaceflight
Space technology
Manned spacecraft

ARTICLE IN PRESS Acta Astronautica (

Add to Reading List

Source URL: ssl.mit.edu

Download Document from Source Website

File Size: 1,31 MB

Share Document on Facebook

Similar Documents

Media Kit 2018 Fintechnews Network Fintechnews Universe Websites are planets, subsites and social media are satellites

Media Kit 2018 Fintechnews Network Fintechnews Universe Websites are planets, subsites and social media are satellites

DocID: 1xTJi - View Document

APRS Link Budgets for Psat, BRICsat and USS Mission Uplinks: Uplink and downlink missions for APRS are unbalanced. The minimum APRS mission for all satellites is to receive at least one mobile or handheld user transmi

DocID: 1vj5P - View Document

Reporting Methods The GOES DCS system design had several factors. First is to be able to perform reliable two-way communication between unmanned small stations and synchronous satellites. The basics of that technology

DocID: 1va71 - View Document

Optical acquisition module 6 Hz ÷ 15 MHz OAM305 TESEO plug-in systems and remote satellites are fiber optic communication links for the

Optical acquisition module 6 Hz ÷ 15 MHz OAM305 TESEO plug-in systems and remote satellites are fiber optic communication links for the

DocID: 1v9IA - View Document

REVOLUTIONIZING SATELLITE MANUFACTURING THROUGH PLUG AND PLAY PROBLEM:SATELLITE COSTS ERODE PROFITS AND LIMITS THE SERVICES “ (satellites) lead times used to be 36 months,” said Jean-Loïc Galle, CEO of Thales Aleni

REVOLUTIONIZING SATELLITE MANUFACTURING THROUGH PLUG AND PLAY PROBLEM:SATELLITE COSTS ERODE PROFITS AND LIMITS THE SERVICES “ (satellites) lead times used to be 36 months,” said Jean-Loïc Galle, CEO of Thales Aleni

DocID: 1uQPW - View Document