Back to Results
First PageMeta Content
Petroleum / Geotechnical investigation / Borehole / Deep foundation / Drilling rig / Standard penetration test / Dolphin / Water well / Geotechnical engineering / Civil engineering / Geology


Geotechnical Investigation, Part 2, Mooring Dolphins Nassau Harbour Port Improvement Project Prepared for: Ministry of Works and Transport
Add to Reading List

Document Date: 2009-07-31 16:24:41


Open Document

File Size: 3,28 MB

Share Result on Facebook

City

the Bahamas Archipelago / Nassau / Brampton / /

Company

Summary Trow International Ltd. / Trow International Ltd. / Trow Associates Ltd. / Cox / Garmin Global Positioning Systems / Toney Drilling Supplies Inc. / Woods Engineering Consulting Inc. / SHAL Consulting Engineers Ltd. / Bahamas Trow International Ltd. / /

Country

Bahamas / Canada / /

Event

Person Communication and Meetings / /

Facility

Harbour Port Improvement Project The Bahamas / Bridge Piers / Harbour Port Improvement Project The Bahamas Drawings Dwg. / Harbour Port Improvement Project / Trow’s laboratory / Nassau Harbour / Harbour Port Improvement Project The Bahamas Trow INTL00302101A / Prince George Wharf / Harbour Port Improvement Project Prepared / Harbour Expansion / Harbour Port Improvement Project The Bahamas Trow INTL00302101A Table / /

IndustryTerm

open ended steel pipe piles / steel open ended pipe piles / steel open ended pipe / steel area / feet diameter steel sheet pile cells / /

Organization

International Society of Rock Mechanics / Ministry of Works / Works and Transport Government of the Bahamas Trow International Ltd. / BEST Commission / Government of Bahamas / Transport Government of the Bahamas Trow International Ltd. / /

Person

Walker / Clark / C. D. Thompson / T. Hluchan / S. Micic / /

/

Position

senior geological engineer / project engineer / Prince / Walker / project manager / geological engineer / engineer / /

ProvinceOrState

Ontario / /

SocialTag