![Vacuum tubes / Electrical engineering / Electromagnetism / Engineering / Diode / Tetrode / Triode / Pentode / Rectifier / Valve / Control grid / MullardPhilips tube designation Vacuum tubes / Electrical engineering / Electromagnetism / Engineering / Diode / Tetrode / Triode / Pentode / Rectifier / Valve / Control grid / MullardPhilips tube designation](/pdf-icon.png) Date: 2010-02-14 13:22:08Vacuum tubes Electrical engineering Electromagnetism Engineering Diode Tetrode Triode Pentode Rectifier Valve Control grid MullardPhilips tube designation | | Before switching “ON” the full instruction Book should be read and always used for reference when testing unusual types of valves. 1. Check mains adjustment tap and connect mains lead to the supply, red and black leAdd to Reading ListSource URL: www.mcmlv.orgDownload Document from Source Website File Size: 127,50 KBShare Document on Facebook
|