MEETING NOTES GREENSBORO FIRE STATION JOB MEETING[removed]Meeting began at the job-site, to update members who had not visited recently. Cupolas are on the roof, and drywall and completion of electric rough-in are underw

Add to Reading List

Source URL: www.greensborovt.org

Download Document from Source Website

File Size: 180,31 KB

Share Document on Facebook

Similar Documents

Title 24 Logo_final_Nov2015

Title 24 Logo_final_Nov2015

DocID: 1rrGA - View Document

Composite materials / Construction / Architecture / Real estate / Acoustics / Building engineering / Wood veneer / Dropped ceiling / Submittals / Door

RULON flat veneer panel CEILING and wall Systems Architectural SPECIFICATIONflat veneer panel CEILING and wall Systems

DocID: 1revE - View Document

Title 24 Logo_final_Nov2015

Title 24 Logo_final_Nov2015

DocID: 1raXT - View Document

Install Guide Flat Panels and Aluratone

Install Guide Flat Panels and Aluratone

DocID: 1qWQl - View Document

Seismic Response of Ceiling/Sprinkler Piping/Partition Systems in NEES TIPS/NEES Nonstructural/NIED Collaborative Tests By Siavash Soroushian, PhD Candidate, College of Engineering, University of Nevada, Reno

Seismic Response of Ceiling/Sprinkler Piping/Partition Systems in NEES TIPS/NEES Nonstructural/NIED Collaborative Tests By Siavash Soroushian, PhD Candidate, College of Engineering, University of Nevada, Reno

DocID: 1qMpp - View Document