Back to Results
First PageMeta Content
Combined cycle / Natural gas / Gas turbine / Energy / Technology / Sumas 2


DRAFT SITE CERTIFICATION AGREEMENT BETWEEN THE STATE OF WASHINGTON AND
Add to Reading List

Document Date: 2011-02-07 13:58:25


Open Document

File Size: 163,56 KB

Share Result on Facebook

City

Kirkland / /

Company

SUMAS ENERGY 2 INC. / West Coast Pipeline Ltd. / /

Country

United States / Canada / /

Event

Environmental Issue / Natural Disaster / /

Facility

BC Hydro’s Clayburn Station / Water Supply System The Generation Facility / Fuel Supply The Generation Facility / F. Natural Gas Pipeline / GENERATION FACILITY / The Generation Facility / Electrical Interconnection The Generation Facility / /

IndustryTerm

natural gas pipeline / supply natural gas / fuel gas system / tall steel stack / natural gas / natural gas-fired electric generation facility / natural gas-fired combined-cycle combustion turbine generator / reduction device / /

Organization

Federal Aviation Agency / Energy Facility Site Evaluation Council / /

Position

A. General / Governor / /

ProvinceOrState

WASHINGTON WHATCOM COUNTY / British Columbia / A. B. / Washington / /

SocialTag