PIPELINE INVESTIGATION REPORT P05H0061 PROGRAMMABLE LOGIC CONTROLLER FAILURE FOOTHILLS PIPE LINES LTD. DECOMPRESSION/RECOMPRESSION FACILITY
Add to Reading List

Document Date: 2013-04-24 15:01:00


Open Document

File Size: 122,33 KB

Share Result on Facebook

City

Empress / NEAR EMPRESS / /

Company

Programmable Logic Controller Failure Foothills Pipe Lines Ltd. / BP Canada / The Foothills Pipe Lines Ltd. / TSB Engineering Laboratory / BP Canada Energy Company / /

Event

Natural Disaster / Reorganization / Man-Made Disaster / /

Facility

Other Factual Information The Foothills Pipe Lines Ltd. decompression/recompression facility / Foothills Pipe Lines Ltd. decompression/recompression facility / DECOMPRESSION/RECOMPRESSION FACILITY BP CANADA ENERGY COMPANY EMPRESS NATURAL GAS LIQUIDS FACILITY / TSB Engineering Laboratory / BP Canada Empress NGL facility / /

IndustryTerm

main and auxiliary lube oil pumps / high-pressure gas / lost oil / natural gas liquids facility / gas leak / lube oil system piping / data communications / control systems / natural gas liquids / natural gas / oil and gas / transportation safety / lube oil pumps / Residue gas / electrical equipment / low lube oil pressure / /

Organization

National Park Service / Transportation Safety Board / National Energy Board / /

Position

control room operator / programmable logic controller / surge controller / Empress / programmable logic controller failed / controller / /

ProgrammingLanguage

NGL / /

ProvinceOrState

Alberta / /

URL

www.tsb.gc.ca / /

SocialTag