Back to Results
First PageMeta Content
High-voltage direct current / European Network of Transmission System Operators for Electricity / Electric power transmission / Static inverter plant / Electric power system / Transmission system operator / Inverter / Synchronous grid of Continental Europe / Electric power / Electromagnetism / Electrical engineering


ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected Power Park Modules 30 April 2014 Notice This document reflects the work done by ENTSO-E in line with ACER’s framework guidelines on
Add to Reading List

Document Date: 2014-06-06 05:56:23


Open Document

File Size: 1,33 MB

Share Result on Facebook

City

Brussels / /

Company

Existing HVDC Systems / Article 62 Limited / Article 12 Limited / Agency for the Coordination / HVDC Converter Station / Agency for the Cooperation / Article 13 Limited / HVDC Systems / Article 57 Limited / /

Event

Force Majeure / Business Partnership / M&A / /

Facility

Remote-end HVDC Converter Station / Demand Facility / HVDC Converter Station / /

/

IndustryTerm

reactive power devices / electricity / electricity grid connections / island systems / internal electricity market / converter unit control equipment / proper technical management / protective and switching devices / auxiliary equipment / lower‐level regional distribution systems / transmission system operators / transmission networks / energy / /

Organization

European Commission / Agency for the Coordination of Energy Regulators / HVDC Converter Unit / European Union / CONTENTS CHAPTER / European Parliament / /

/

Position

GENERAL REQUIREMENTS / General / /

Product

Park Module / /

ProgrammingLanguage

EC / DC / /

Technology

Simulation / /

SocialTag