Dam Storage Alternative 1 Introduction HDR Engineering Inc. / Stakeholder Group / Reclamation Pacific Northwest Regional / /
Currency
USD / /
Event
Natural Disaster / FDA Phase / /
Facility
Teton Dam / Dam Configuration / building Teton Dam / /
IndustryTerm
conveyance systems / /
NaturalFeature
Snake River / Teton River / Teton River canyon / /
OperatingSystem
Fork / /
Organization
Lower Teton Division / Congress / Bureau of Reclamation / Alternative (Alternative) / U.S. Department of the Interior Bureau of Reclamation Pacific Northwest Regional office Snake River Area office Boise / U.S. DEPARTMENT OF THE INTERIOR / /