Back to Results
First PageMeta Content
Capital Red Rose Corridor / Trans-European Transport Networks / Loading gauge / Transport / ERA Technical Specifications for Interoperability / Interoperability


ANNEX 3: PRIORITY "RAIL INTEROPERABILITY" The overall objectives and priorities are set out in chapter[removed]of the Multi-annual Work programme. http://inea.ec.europa.eu/download/calls2014/cef_transport/map_313_rail_inte
Add to Reading List

Document Date: 2014-09-12 05:53:15


Open Document

File Size: 181,49 KB

Share Result on Facebook

City

Train / /

Continent

Europe / /

IndustryTerm

railway infrastructure / interoperable systems / energy subsystems / /

Organization

TAF TSI / TSI OPE / European Union / TSI TAP / TAP TSI / European Parliament / /

ProgrammingLanguage

EC / /

PublishedMedium

Rolling Stock / /

RadioStation

Core / /

URL

http /

SocialTag