First Page | Document Content | |
---|---|---|
Date: 2014-11-26 01:40:50Electromagnetism Electric power Capital expenditure Operating expense Terranora interconnector Electric power transmission TransGrid Building block model Monopoly Microeconomics Capital | We have made a draft decision for the Directlink interconnector, which connects the Queensland and New South Wales transmission networks. Our draft decision allows Directlink to recover $76.3 million ($nominal) from itsAdd to Reading ListSource URL: www.aer.gov.auDownload Document from Source WebsiteFile Size: 378,40 KBShare Document on Facebook |
Engineers Ireland Excellence Awards 2013 Entry for Engineering Project of the Year category EAST WEST INTERCONNECTOR 500 MW of power outputDocID: 16cyP - View Document | |
APT- DL NEWLTR_MAR07_v2.inddDocID: XT1b - View Document | |
Australian Pipeline Trust Interim Financial Report 31 December 2006 Australian Pipeline Trust Directors’ ReportDocID: XxVA - View Document | |
PDF DocumentDocID: XpEd - View Document | |
LC Paper No. CB[removed]) For discussion on 28 July[removed]LEGISLATIVE COUNCIL PANEL ON ECONOMIC SERVICESDocID: WZWO - View Document |