Back to Results
First PageMeta Content
Civil engineering / Truss bridge / Arch bridge / Truss / Arch / Buckling / Bridges / Structural engineering / Engineering


The Design and Construction of the Chitose Bridge Mitsugu Ishida : Manager of Bridge Department, Public Works Division,
Add to Reading List

Document Date: 2009-06-02 11:03:24


Open Document

File Size: 1,29 MB

Share Result on Facebook

City

Osaka City / Osaka / /

Company

Case / /

Currency

pence / /

Facility

Osaka Port / Eastern District Public Works Station / Bridge Department / Namihaya Bridge / Bridge Bridge Type Length / Chitose Bridge I. PLAN AND DESIGN AT THE CHITOSE BRIDGE / Bridge Type As / Senbonmatsu Bridge / Arch Block / Sinkizugawa Bridge / Minato Bridge / Main Bridge / Arch Section Form / Structural Section Form This bridge / Osaka City Government ABSTRACT The Chitose Bridge / Chitose Bridge / /

IndustryTerm

road traffic network / less steel / marine transportation / steel pipe sheet pile well foundations / rubber bearing / Transportation height / construction management / /

NaturalFeature

Shirinashi river / Osaka Bay / Kizu river / /

Organization

Administration Division / Yard Photo.3 Assembly of Truss Block / Public Works Division / Osaka City Government / Photo.2 Assembly of Arch Block / Block Assembly / Public Works Bureau / /

Person

Arch Rib / Yoshinori Nagai / Yasunari Nakano / Kenji Fujitani / /

Position

Chief of Bridge Department / Manager of Bridge Department / General / /

SocialTag