<--- Back to Details
First PageDocument Content
Seismology / Electric power / Earthquakes / Earthquake engineering / Seismic risk / Power outage / Electric power transmission / Los Angeles Department of Water and Power / Seismic analysis / Civil engineering / Engineering / Electromagnetism
Date: 2007-06-14 12:29:54
Seismology
Electric power
Earthquakes
Earthquake engineering
Seismic risk
Power outage
Electric power transmission
Los Angeles Department of Water and Power
Seismic analysis
Civil engineering
Engineering
Electromagnetism

Resilience of Integrated Power and Water Systems by Masanubu Shinozuka, Stepahanie E. Chang, Tsen-Chung Cheng, Maria Feng, Thomas D. O’Rourke, M. Ala Saadeghvaziri, Xuejiang Dong, Xianhe Jin, Yu Wang, and Peixin Shi Re

Add to Reading List

Source URL: mceer.buffalo.edu

Download Document from Source Website

File Size: 1,92 MB

Share Document on Facebook

Similar Documents

Automated Vulnerability Analysis of AC State Estimation under Constrained False Data Injection in Electric Power Systems Sicun Gao1 , Le Xie2 , Armando Solar-Lezama1 , Dimitrios Serpanos3 , and Howard Shrobe1 Abstract—

Automated Vulnerability Analysis of AC State Estimation under Constrained False Data Injection in Electric Power Systems Sicun Gao1 , Le Xie2 , Armando Solar-Lezama1 , Dimitrios Serpanos3 , and Howard Shrobe1 Abstract—

DocID: 1xU8c - View Document

March 20, 2018  Kyushu Electric Power Company Inc. Rejection of the Temporary Injunction against Restart of Genkai Nuclear Power Station Units No.3 and 4

March 20, 2018 Kyushu Electric Power Company Inc. Rejection of the Temporary Injunction against Restart of Genkai Nuclear Power Station Units No.3 and 4

DocID: 1vrhI - View Document

TRANSFORMER  Power Planar Magnetics and Hybrid Electric Vehicles The HEVs are here – and more are coming The electronic circuits in a hybrid electric vehicle must operate in an extreme temperature

TRANSFORMER Power Planar Magnetics and Hybrid Electric Vehicles The HEVs are here – and more are coming The electronic circuits in a hybrid electric vehicle must operate in an extreme temperature

DocID: 1vn7A - View Document

Where Does Our Electric Power Come From? Since November 1, 2014, the Kirkwood Meadows Public Utility District has purchased all of its power (except for emergency diesel generation) off of the Western power grid. Grid po

Where Does Our Electric Power Come From? Since November 1, 2014, the Kirkwood Meadows Public Utility District has purchased all of its power (except for emergency diesel generation) off of the Western power grid. Grid po

DocID: 1vip9 - View Document

profiles Modernization and refurbishment of San Miguel Electric Cooperative’s Rothemühle® regenerative heat exchanger results in a 3 MW savings in plant auxiliary power. Recent upgrades to the Rothemühle regenerativ

profiles Modernization and refurbishment of San Miguel Electric Cooperative’s Rothemühle® regenerative heat exchanger results in a 3 MW savings in plant auxiliary power. Recent upgrades to the Rothemühle regenerativ

DocID: 1v7GL - View Document