| Document Date: 2012-04-09 11:14:07 Open Document File Size: 61,99 KBShare Result on Facebook
City El Centro Library / El Centro / San Diego / / Company State Street / Imperial Irrigation District / / Currency USD / / / Event Product Issues / FDA Phase / / Facility Facility The El Centro Generating Station / El Centro Generating Station / Centro Library / / / IndustryTerm outdoor equipment / farm drainage services / cement integrity / cement / / NaturalFeature Salton Sea / Imperial Valley / Alamo River / Wastewater streams / / Organization Environmental Appeals Board / California Division of Oil / Gas / and Geothermal / U.S. Environmental Protection Agency / Ground Water Office / / Person Dave Basinger / Henryk Olstowski / / / Position Assistant Manager / Energy Imperial Irrigation District / Environmental Engineer / surface conductor / Director / Major / representative / General / drilling consultant / / Product Maximum Available Injection / Underground Injection / waste / fluids / UIC / waste determination / IW-1 / / ProvinceOrState Imperial County / San Diego / Riverside / California / / Technology html / / URL http /
SocialTag |