<--- Back to Details
First PageDocument Content
Osaka Gas / Ichthys / Energy / Economy of Asia / Inpex / Economy of Japan / Liquefied natural gas
Date: 2014-07-23 04:35:39
Osaka Gas
Ichthys
Energy
Economy of Asia
Inpex
Economy of Japan
Liquefied natural gas

Public Relations Group, Corporate Communications Unit Akasaka Biz Tower, 5-3-1 Akasaka, Minato-ku, Tokyo[removed]JAPAN 12 July[removed]Transfer of the Ichthys LNG Project equity interest (6%) to TOTAL

Add to Reading List

Source URL: www.inpex.co.jp

Download Document from Source Website

File Size: 196,93 KB

Share Document on Facebook

Similar Documents

IoT/ BigData/ Monitoring  Unconventionals Offshore Gas Development Ichthys LNG Project

IoT/ BigData/ Monitoring Unconventionals Offshore Gas Development Ichthys LNG Project

DocID: 1uGLs - View Document

ICHTHYS - FACHTAG Herausforderungen in der SuchtarbeitVeranstaltungsort

ICHTHYS - FACHTAG Herausforderungen in der SuchtarbeitVeranstaltungsort

DocID: 1spSv - View Document

MEDIA RELEASE 14 May 2016 LAST FPSO TOPSIDES LIFT A KEY STEP FOR ICHTHYS PROJECT Signifying a major step forward in the progress of the INPEX-led Ichthys LNG Project, the last topsides lift on the Floating Production, St

MEDIA RELEASE 14 May 2016 LAST FPSO TOPSIDES LIFT A KEY STEP FOR ICHTHYS PROJECT Signifying a major step forward in the progress of the INPEX-led Ichthys LNG Project, the last topsides lift on the Floating Production, St

DocID: 1oE45 - View Document

Case Study Ichthys Onshore LNG Facility, Australia Blast, Fire and Thermal Design for Local Equipment Rooms (LER) and Local Instrument Rooms (LIR) Scope of Work The original scope was to design, engineer, manufacture and

Case Study Ichthys Onshore LNG Facility, Australia Blast, Fire and Thermal Design for Local Equipment Rooms (LER) and Local Instrument Rooms (LIR) Scope of Work The original scope was to design, engineer, manufacture and

DocID: 1ocUs - View Document

Case Study Ichthys Onshore LNG Facility, Australia Blast, Fire and Thermal Design for Local Equipment Rooms (LER) and Local Instrument Rooms (LIR) Scope of Work The original scope was to design, engineer, manufacture and

Case Study Ichthys Onshore LNG Facility, Australia Blast, Fire and Thermal Design for Local Equipment Rooms (LER) and Local Instrument Rooms (LIR) Scope of Work The original scope was to design, engineer, manufacture and

DocID: 1nXLC - View Document