Water heating / Mechanical engineering / Technology / Boilers / Heating /  ventilating /  and air conditioning / Plumbing


Deleted: Durham Region & York Region Waste Treatment Facility¶ Technical Requirements¶ For A¶ 140,000 Tonne per Year Energy From Waste Facility
Add to Reading List

Document Date: 2013-08-21 12:08:03


Open Document

File Size: 1,37 MB

Share Result on Facebook

City

York / Durham / /

Company

Waste Water Treatment Systems / AIR POLLUTION CONTROL (APC) SYSTEMS / EMERGENCY AND DC POWER SYSTEMS / Paralleling Systems / Chemical Feed Systems / /

Event

Environmental Issue / /

Facility

FACILITY CAMERAS / STATION AUXILIARIES AND STEP-UP TRANSFORMER / Base Facility The Facility / FACILITY SITE / FACILITY DESCRIPTION / FACILITY EXPANSION CAPABILITY / The Facility / Administration Building / /

IndustryTerm

waste processing requirements / transportation / per-year processing capacity / ultimate processing capacity / guaranteed initial processing rate / pre-qualified combustion technologies / start-up / ash vitrification technology / combustion technology / district energy system / guaranteed initial phase processing rate / project management / minimum processing rate / functional energy / mass burn energy / ultimate total processing capacity / pollution control equipment / energy / /

Organization

Visitor Education Center / European Union / Ontario Ministry of Environment / /

Position

Contractor / General / DBO Contractor / /

Product

Activated Carbon Injection / /

ProvinceOrState

DURHAM / Ontario / /

Technology

ash vitrification technology / RADIATION / combustion technology / POLLUTION CONTROL SYSTEM / pre-qualified combustion technologies / pollution control / /