Back to Results
First PageMeta Content
Petroleum engineering / Petroleum production / Drillship / Dynamic positioning / Engineering / Top drive / Crane / Drilling riser / Petroleum / Technology / Oilfield terminology


The world’s first ice class +1A1 dual mast, ultra deepwater drillship for Arctic conditions General Description Stena DrillMAX ICE will be the world’s first dynamically positioned, dual mast ice-class +1A1 drillshi
Add to Reading List

Document Date: 2012-07-06 05:37:18


Open Document

File Size: 542,37 KB

Share Result on Facebook

City

Aberdeen / /

Company

CRANE / National Oilwell / Greenbank / DYNAMIC POSITIONING SYSTEM DP3 POWER SYSTEMS / Stena Drilling Limited / Samsung Heavy Industries / /

Country

Scotland / South Korea / /

Facility

ROTARY TABLE STANDBUILDING TOWER / stowage Control System Designed / Standbuilding Tower / Sauna Drilling Equipment MASTS / Operators Cyberbase Operation Station / For building / facility XT / /

/

IndustryTerm

under hull guide systems / /

OperatingSystem

XTs / /

Organization

Main Centre / Ram Unit / AUXILIARY MAST AUXILIARY CENTRE / Auxiliary Centre / TOP DRIVE Main Centre / Ship-Shaped Drilling Unit / /

Person

Cameron LoadKing / Cameron Bi-directional Rams / Dual Drillers / /

/

Position

CONTROL CABIN Knuckleboom crane model / gripper head / /

Product

EH-101 / S-92 ACCOMMODATION / /

PublishedMedium

BOP / /

Technology

API / /

URL

www.stena-drilling.com / /

SocialTag