Back to Results
First PageMeta Content
Earth / Water / Clean Water Act / Outfall / Effluent / Constructed wetland / Wetland / United States regulation of point source water pollution / Environment / Water pollution / Environmental engineering


Fact Sheet for the Draft NPDES Permit for Washington Beef, LLC., Toppenish, WA
Add to Reading List

Document Date: 2014-08-22 15:03:31


Open Document

File Size: 718,55 KB

Share Result on Facebook

City

Parker / Toppenish / Seattle / Slough / Lacey / Granger / Washington / Outfall / /

Company

Washington Beef LLC / Water Quality Limited / Spencer Lateral 1 Washington Beef Inc. / Washington Beef Inc. / A. Facility Description Washington Beef LLC / I. APPLICANT Washington Beef LLC / /

Country

United States / /

/

Event

Company Expansion / M&A / /

Facility

FACILITY INFORMATION A. Facility Description Washington Beef LLC / Facility Contact / Facility Description / FACILITY INFORMATION / Facility Location / Facility Changes / C. Treatment The facility / /

IndustryTerm

land application site / meat processing / /

MusicGroup

Washington / Flow / Caldwell / /

NaturalFeature

Yakima River / /

Organization

United States Environmental Protection Agency / National Science Foundation / U.S. Environmental Protection Agency / office of Water and Watersheds / Yakama Nation Department / /

Person

Harris Drain / Spencer Lateral / Sherry Byers-Eddy / Kathleen Collins / Robert Grandinetti / /

/

Position

Inspector / Manager Facility Mailing Address / compliance officer / regional Director / representative / /

ProvinceOrState

Alaska / Oregon / Washington / Idaho / /

RadioStation

WIP / /

URL

http /

SocialTag