Back to Results
First PageMeta Content
Economy of Ontario / Electric power distribution / Smart grid / Smart meter / Toronto Hydro / Hydro One / Thunder Bay Hydro / Meter Data Management / Energy / Ontario electricity policy / Electric power


Smart Meter Deployment and the Application of Time of Use Pricing
Add to Reading List

Open Document

File Size: 53,88 KB

Share Result on Facebook

City

Cambridge / North Dumfries Hydro / Brampton / Ottawa / /

Company

Norfolk Power Distribution / Oakville Hydro Electricity Distribution Inc. / Sudbury / Waterloo North / Orillia Power Distribution Corporation / Veridian Connections Inc. / Hydro One Networks / Distributor Algoma Power Inc. / Northern Ontario Wires Inc. / Kingston Hydro Corporation / Westario Power / E.L.K. Energy Inc. / Erie-Thames Powerlines Corp. / Horizon Utilities / Oshawa PUC Networks / Orillia Power Oshawa PUC Peterborough Distribution Inc. / Powerstream Inc. / Chapleau Public Utilities Corporation / Partial Extensions Haldimand County Hydro Inc. / Newmarket-Tay Power Distribution / Algoma Power Inc. / Grimsby Power* Guelph Hydro (partial) Hydro One Networks / Hydro Ottawa Innisfil Hydro Kingston Electricity Distribution Ltd / West Perth Power Inc. / Toronto Hydro Electric Systems / /

Country

Canada / /

Facility

Fort Erie / Port Colborne / Fort Frances Power / Fort Erie)* COLLUS Power Cooperative Hydro Embrun Eastern / Port Colborne Hydro* Thunder Bay Hydro Veridian / /

IndustryTerm

energy consumption / extension applications / /

Organization

IESO / General Service / Ministry of Energy / /

Person

Kent Hydro / Kent Power Guelph / /

Product

Kingston Electricity / Middlesex / /

PublishedMedium

the SME / /

Region

Northern Ontario / Eastern Ontario / /

URL

http /

SocialTag