Back to Results
First PageMeta Content
Reservoir / Discharge / Engineering / Water / Tunnel and Reservoir Plan / Physical geography


THORNTON TRANSITIONAL RESERVOIR STORM WATER MANAGEMENT Didi G. Duma1 and G. Nicholas Textor2 Consoer Townsend Envirodyne Engineers, Inc.
Add to Reading List

Document Date: 2011-09-10 03:00:18


Open Document

File Size: 731,89 KB

Share Result on Facebook

City

Chicago City / Chicago / /

Company

TRANSPORT AND BANK PROTECTION / Consoer Townsend Envirodyne Engineers Inc. / INTRODUCTION Consoer Townsend Envirodyne Engineers Inc / Nicholas Textor2 Consoer Townsend Envirodyne Engineers Inc. / /

Event

Natural Disaster / Environmental Issue / /

Facility

Calumet Water Reclamation Treatment Plant / University of Mississippi / Calumet tunnel / Calumet Water Reclamation Plant / /

IndustryTerm

bank / bank protection / mining / creek bank / /

NaturalFeature

Calumet River / Lake Michigan / Little Calumet River / Thorn Creek / /

Organization

United States Army / National Center for Computational Hydroscience and Engineering / Duma / Hydraulics Division / University of Mississippi / /

Person

Thornton Composite / Yafei Jia / Sam S.Y. Wang / Thornton Quarry / THORNTON TRANSITIONAL / /

Position

Head of Environmental Resources Department / Project Manager / /

Product

Nikon D50 Digital Camera / /

ProvinceOrState

Illinois / Mississippi / Michigan / /

Technology

simulation / pollution control / /

SocialTag