<--- Back to Details
First PageDocument Content
Technology / USB 3.0 / USB Implementers Forum / Total Phase / LeCroy Corporation / USB Attached SCSI / EXtensible Host Controller Interface / USB / Computer hardware / Universal Serial Bus
Date: 2011-03-01 00:11:58
Technology
USB 3.0
USB Implementers Forum
Total Phase
LeCroy Corporation
USB Attached SCSI
EXtensible Host Controller Interface
USB
Computer hardware
Universal Serial Bus

MEDIA ALERT CONTACT: Mary Slonske Nereus for USB-IF +

Add to Reading List

Source URL: www.usb.org

Download Document from Source Website

File Size: 38,66 KB

Share Document on Facebook

Similar Documents

STONEHENGE SPEAKS: AN OPEN LETTER TO UMBERTO ECO  Stonehenge phase IIIA: (above) elements intact, (below) reconstructed as built. This reconstruction contains 73 stones total and 5 trilithons (central archways) possibly

STONEHENGE SPEAKS: AN OPEN LETTER TO UMBERTO ECO Stonehenge phase IIIA: (above) elements intact, (below) reconstructed as built. This reconstruction contains 73 stones total and 5 trilithons (central archways) possibly

DocID: 1vh6v - View Document

P4.467  Effect of ZX008 (Fenfluramine HCl Oral Solution) on Total Seizures in Dravet Syndrome in a Phase 3 Clinical Trial Joseph Sullivan, Lieven Lagae, Kelly Knupp, Bradley S. Galer, Glenn Morrison, Arnold Gammaitoni, G

P4.467 Effect of ZX008 (Fenfluramine HCl Oral Solution) on Total Seizures in Dravet Syndrome in a Phase 3 Clinical Trial Joseph Sullivan, Lieven Lagae, Kelly Knupp, Bradley S. Galer, Glenn Morrison, Arnold Gammaitoni, G

DocID: 1v3Zy - View Document

Homework 1 Using 50 cm long quadrupoles design a 10 meter long periodic FODO cell to transport protons of total energy of 8 GeV. Tune the lattice to 60 deg. phase advance in both planes. Plot beta functions across the la

DocID: 1uYPR - View Document

”Fast Total Monte Carlo” applied to Phase II-2: PWR assembly depletion C.M. Sciolla and D. Rochman Nuclear Research and Consultancy Group, NRG, Petten, The Netherlands

”Fast Total Monte Carlo” applied to Phase II-2: PWR assembly depletion C.M. Sciolla and D. Rochman Nuclear Research and Consultancy Group, NRG, Petten, The Netherlands

DocID: 1uIp7 - View Document

”Total Monte Carlo” Uncertainty propagation applied to the Phase II-2 burnup calculation (A report for the Assembly Physics of TMI-1 PWR unit cell of the OECD/UAM working group)  D. Rochman and C.M. Sciolla

”Total Monte Carlo” Uncertainty propagation applied to the Phase II-2 burnup calculation (A report for the Assembly Physics of TMI-1 PWR unit cell of the OECD/UAM working group) D. Rochman and C.M. Sciolla

DocID: 1uFzW - View Document