Back to Results
First PageMeta Content
Passive fire protection / Safety / Construction / Occupancy / Fire damper / Smoke dampers / Plan / Fire protection / Duct / Architecture / Building engineering / Heating /  ventilating /  and air conditioning


When Professional Design is required for New Buildings:  1. Project includes Group A‐E‐I‐H occupancies or R occupancy not built under IRC.    2. Project is 10,000 sq. ft. or more and no
Add to Reading List

Document Date: 2013-03-27 16:43:29


Open Document

File Size: 84,08 KB

Share Result on Facebook
UPDATE