Back to Results
First PageMeta Content
Building engineering / Sustainable building / Concrete / Energy conservation / Sustainable architecture / Formwork / Modular building / Sustainable design / Pod / Architecture / Construction / Environment


Fast - Finish an average sized home in just under 6 weeks Tough - Cyclone-tested, termite and fire resistant Savings - Eliminate up to 70% trades on-site Flexible - Public, private and commercial potential Adaptable - Po
Add to Reading List

Document Date: 2011-06-07 20:31:08


Open Document

File Size: 1,44 MB

Share Result on Facebook

Company

Podfirst / /

Country

Australia / /

/

Facility

Multi-residential building / /

IndustryTerm

energy costs / multi-level applications / pod technology / water saving devices / energy / /

/

Technology

building technology / building technologies / pod technology / design protocols / /

URL

www.podfirst.com.au / /

SocialTag