Back to Results
First PageMeta Content
Gasket / Tent / Architecture / Construction / Mechanical engineering / Passive fire protection / Doors / Fire door


Project Specific Specification WORSHIP CENTER/CHURCH Part 1 - GENERAL 1.01 Work Included The work under this section shall include the furnishing of all items shown on the drawings and as specified, including but not lim
Add to Reading List

Document Date: 2012-09-21 17:17:51


Open Document

File Size: 29,29 KB

Share Result on Facebook

City

Pacoima / TA / /

Company

Acceptable Manufacturers A. Timely Industries / Colonial Steel / SDS Industries Inc. / Coastal / Colonial Style Steel / /

Event

Man-Made Disaster / /

Facility

M. Factory / Fit factory / Factory Emboss / /

/

IndustryTerm

steel glass stop pre-cut / stainless steel / removable rolled steel / pre-finished opening systems / paint system / white prime paint / galvanized steel / interior and exterior applications / paint / gauge steel / paint materials / surface hardware / pre-finished steel door / pre-engineered opening systems / corrosive chemicals / rolled steel / gage steel / steel / /

MarketIndex

TA 30 / TA 25 / TA 10 / TA 35 / /

OperatingSystem

Microsoft Windows / /

Organization

Division of SDS Industries / Specific Specification WORSHIP CENTER / Frame Assembly / /

Person

Rim Exit / Autumn Brown / K. Attach / /

/

Position

Designer / head / /

ProvinceOrState

California / /

URL

www.timelyframes.com / /

SocialTag