Back to Results
First PageMeta Content
Environmental engineering / Pump / Physical geography / Vacuum sewerage / Vacuum sewer / Civil engineering / Sewerage / Water pollution


Sample Annual O&M and Short-Lived Asset Reserve Costs Example of information requested in the Preliminary Engineering Report, section 6.f.ii and iv. The cost to operate the entire system needs to be provided. For example
Add to Reading List

Document Date: 2013-11-08 18:59:52


Open Document

File Size: 42,98 KB

Share Result on Facebook

Currency

USD / /

IndustryTerm

electricity / /

SocialTag