Back to Results
First PageMeta Content
Bodies of water / Water / Geotechnical engineering / Watts Bar Dam / Ash pond / Dam / Levee / Volcanic ash / Kingston Fossil Plant / Tennessee / Tennessee River / Tennessee Valley Authority


Executive Summary for Root Cause Analysis of Kingston Dredge Cell Failure The failure occurred around 1:00 a.m. EST, on Monday, December 22, 2008, when the north and central portions of Cell 2 at the Kingston Fossil Plan
Add to Reading List

Document Date: 2009-06-26 12:49:31


Open Document

File Size: 2,58 MB

Share Result on Facebook

City

Kingston / Slough / Knoxville / /

Event

Natural Disaster / /

Facility

Dike C. Based / Dike C. Thus / Dike C. / Kingston Fossil Plant / Dike C. This / Watts Bar Dam / Divider Dike / Kingston Steam Plant / Dike C. In / Kingston plant / /

IndustryTerm

electricity / construction equipment / bank / left bank / ash storage site / ash disposal site / combustion exhaust gas / atomic energy installations / energy / /

NaturalFeature

Emory River / Swan Pond Creek / Emory River Channel / Tennessee River / Clinch River / /

Organization

Portland Cement Association / Tennessee Department of Environment and Conservation / Tennessee Valley Authority / /

Person

Clay Failed Ash Unfailed Slimes / /

Position

Executive / /

ProvinceOrState

Tennessee / Virginia / Alabama / Georgia / Roane County / /

Technology

cellular telephone / /

SocialTag