Back to Results
First PageMeta Content
Civil engineering / Aquatic ecology / Fish ladder / Fisheries / Weir / Peconic River / Dams / Water / Hydraulic engineering


Upper Mills Dam – Peconic River Feasibility Study Report: Alternatives for Fish Passage February 28, 2011
Add to Reading List

Document Date: 2013-02-12 11:59:54


Open Document

File Size: 1,95 MB

Share Result on Facebook

City

Riverhead / Southampton / Long Island / /

Company

US Reservation Brookhaven National Laboratory / Inter-Fluve Inc. / Dunn Engineering / Dunn Engineering Associates / National Grid / /

Event

Natural Disaster / /

Facility

USGS Weir / Weir Notch / Peconic Airport / US Reservation Brookhaven National Laboratory / LIPA substation / Upper Mills Dam / Upper Mills Dam Feasibility Report EXISTING CONDITIONS Site Description Upper Mills Dam / /

IndustryTerm

corrugated metal pipe / electricity / utilities present challenges / study site / heavy equipment / overhead carrying electricity / gas line lies / gas line / /

NaturalFeature

Peconic River / New England rivers / American Rivers / Flanders Bay / /

Organization

Long Island Power Authority / Brookhaven National Lab / Peconic River Fish Restoration Commission / /

Position

representative / /

ProvinceOrState

New York / /

RadioStation

Weir / /

Region

Northeastern U.S. / New England / /

SocialTag